Singapore'sboutique landedhome builder.
We listen to every detail you wish for in your home — and we build it with our hearts. Building well doesn't mean building big. It means building right.
Watch your home take shape.
Keep scrolling. This is how every Hitomo home goes from an empty plot to your front door — with one in-house team the whole way.
- Stage 01
Site & approvals
We survey your plot, handle the URA and BCA submissions, and put up hoarding before work begins.
- Stage 02
Piling & foundations
Piles and a reinforced-concrete base — the part you never see, built by our own crew.
- Stage 03
Structure
Columns and floor slabs rise level by level. Our concrete team is in-house, so there are no handoffs.
- Stage 04
Walls & windows
Masonry, M&E routing and window frames — checked before anything is covered up.
- Stage 05
Roof & façade
Roof terrace, overhangs and the aluminium façade that gives your home its character.
- Stage 06
Handover
Hoarding comes down, the garden and pool go in, the lights come on. Every stage was in your private client portal along the way.
Building well means
building right.
Hitomo Construction Singapore (2010) Pte Ltd is a BCA Class 1 builder and a developer. We design, submit, build and fit out under one roof — and because we develop our own homes too, we build yours to the standard we hold for ourselves.
Builder & developer
We also develop our own landed homes, which gives us deeper insight into cost control, buildability and long-term property value.
Trades under one roof
Reinforced concrete, demolition, masonry, electrical, ceiling, painting, aluminium doors & windows and roofing — by our own teams.
Buildable design
Layouts and details that look good and make sense to build — because a beautiful home should also be a practical one.
Detailed, fair contracts
Every cost itemised. No hidden charges, no surprise variation orders. What we promise, we put in writing.
Homes we've brought to life.







Eight homes completed.
Six more rising now.
See the full portfolio →
20 Simon Road
A brand-new freehold landed home minutes from Kovan MRT. Six ensuite bedrooms, a home lift to every level and roof terraces, wrapped in a modern aluminium veneer façade. Expected TOP Q3 2027.
Follow your build from anywhere.
Building a home shouldn't mean wondering what's happening on site. Every Hitomo client gets a private portal to follow their build — no chasing, no guesswork.
- Weekly site photo updates — see your home progress, week by week.
- Live progress & milestones — structure, M&E and finishes, all tracked.
- Tracked decisions — every choice you make, recorded and dated, so nothing slips.
- Approvals & quotations in one place — every cost in writing, nothing hidden.
- Drawings, permits & documents — always current, always accessible.
Trusted by families.
I am glad I chose Hitomo because their quotation is really detailed. I told Serene that I am very scared of all the hidden costs as I heard many horror stories, and this is one key reason why I chose to go with them.— Mr Thomas Yeo
I highly recommend Hitomo Construction to anyone seeking a reliable, detail-oriented contractor for a home rebuild or renovation. Their professionalism and quality of delivery make them a standout choice.— Ms Tung
Thank you Serene & Hitomo. Thank you for helping us design our home, for looking after our house and making my new home cosy and pretty.— Ms Chan
Learn before you build.

Concealed-Work Checks for a Landed Rebuild: Before Walls and Ceilings Close
Plan concealed-work checks before walls and ceilings close: waterproofing, plumbing, electrical coordination and records for a Singapore landed rebuild.

Landed Rebuild Handover Checklist: TOP, Defects and Move-in Planning
Prepare for a Singapore landed rebuild handover: confirm TOP or CSC, organise inspections, collect records and plan a practical move into your new home.

Turnkey Design & Build for a Landed Rebuild in Singapore: Who Handles What?
Understand who coordinates design, submits plans, builds, makes decisions and prepares handover records in a turnkey Singapore landed house rebuild.
Ready to build your dream home?
Tell us about your plot and your vision. We'll walk you through the process, the timeline and a clear, itemised cost — with no hidden surprises.