Our process

From visionto reality.

Every Hitomo project follows a structured 8-step process — designed to keep your build on time, on budget, and exactly as you envisioned.

A process built on transparency

Clarity and confidence at every stage.

Building a landed home is a significant undertaking. Here’s how we work — from the first conversation to the moment you step through your front door.

01

No surprises

Every phase has clear deliverables and timelines. You’ll always know where your project stands and what comes next.

02

Single point of contact

One dedicated project manager oversees your whole journey — from design through construction to handover.

03

Full visibility

Regular progress updates with photos in your client portal, transparent budgeting and scheduled site visits.

The 8 steps

How we take you from plot to keys.

  1. Site visit & consultation

    We visit your property, listen to your goals, assess the site conditions, and discuss your budget and timeline. This is a no-obligation conversation — we want to understand what you need before anything else.

    We’ll also check the planning envelope, existing structural condition and any regulatory considerations (setbacks, GFA, PUB sewer lines) that could shape the project scope.

  2. Design development

    Once you decide to proceed, our design team develops the concept into detailed architectural plans — spatial planning, façade design, material palettes and interior layouts — collaborating closely with you at every stage.

    Structural and M&E engineering are coordinated in parallel, so the design is buildable from day one — not reworked later.

  3. Detailed engineering & contracts

    Once the design is final, we complete all construction drawings, engineering details, material specifications and the construction schedule. The contract is signed with a clear milestone-based payment schedule — no front-loaded deposits.

    Pre-construction surveys (party wall, soil investigation, PUB sewer CCTV) are completed during this phase.

  4. Authority submissions

    We handle all government submissions on your behalf — URA planning permission, BCA building plan approval, structural plan submission and PUB drainage applications — each coordinated with the appointed QP and consulting engineers.

  5. Demolition & structure

    Construction begins with demolition and site preparation, followed by foundation works, the reinforced-concrete structure and the roof. This is the most intensive phase — our project managers are on site daily to oversee quality, safety and schedule.

  6. Finishes & fit-out

    With the structure complete, we move into M&E installation, waterproofing, tiling, carpentry, painting and all interior finishes. Our interior team works alongside the build team so every detail matches the approved design.

    Material selections are confirmed early, so there are no delays waiting for decisions during this phase.

  7. Inspection & defects check

    Before handover, we carry out a thorough internal quality inspection covering every room, system and finish. We then walk through the home with you for a joint inspection, documenting any items for rectification.

    All defects are resolved before the handover date — not after you move in.

  8. Handover & aftercare

    We apply for the Temporary Occupation Permit (TOP) and hand over your completed home with full documentation — as-built drawings, O&M manuals, warranty certificates and appliance guides.

    Our defects liability period begins at handover. We remain responsive and accountable — because the relationship doesn’t end when the keys change hands.

Typical project timeline

A full rebuild, phase by phase.

Indicative durations — they vary with project scope and complexity. Try the timeline calculator for your own project.

Phase 1
1 month

Consultation & site assessment

Phase 2
2–3 months

Design development

Phase 3
2–4 months

Authority submissions

Phase 4
1 month

Pre-construction

Phase 5
4–6 months

Demolition & structure

Phase 6
5–8 months

Construction — finishing

Phase 7–8
1 month

Inspection & handover

Total
12–18 months

From first consultation to key handover.