1. Home
  2. Reconstruction
Reconstruction

Reconstruction &new erection.

When your existing home has reached the end of its life — or you want to unlock its full potential — we take it from demolition to a brand-new landed home, entirely in-house, to BCA Class 1 standards.

Reconstruction

Reconstruction, new erection & rebuilds

A landed reconstruction — often called a new erection or rebuild — means taking down the existing house and building a new one in its place, or rebuilding more than half of the structure and gross floor area. It's the route homeowners take when an older property no longer suits how they live, or when they want to maximise the buildable area and value of the plot.

As an integrated builder and developer, Hitomo manages the entire journey — feasibility, design, URA and BCA submissions, demolition, piling and foundation, superstructure, M&E and finishing — under one roof. For a sense of budgets and timelines, see our guide to rebuilding a landed property in Singapore.

The Rebuild Journey

From demolition to handover

01

Feasibility & design

We assess the plot's potential under URA guidelines and design a home that maximises space, light and value within the envelope.

02

Submissions & approvals

URA planning and BCA building submissions coordinated with the qualified person and professional engineer.

03

Demolition & foundation

Safe demolition of the existing structure, followed by piling and foundation works engineered for your new home.

04

Structure, M&E & finishing

Reinforced concrete superstructure, mechanical & electrical, and interior finishing — tracked week by week in your client portal through to TOP and CSC handover.

Why Rebuild

When a Full Reconstruction Makes Sense

Prefer a single team for design and build? Explore design & build.

Reconstruction / rebuild

  • A fundamentally new home, designed from scratch
  • Best when the existing structure is old or unsuitable
  • Opportunity to maximise gross floor area and value
  • A clear, fully planned timeline and budget from day one
FAQ

Your questions, answered.

When does a landed home need a full reconstruction?

Reconstruction (or new erection) means demolishing the existing house and building a new one, or rebuilding more than half of the structure and gross floor area. It's the right route when the existing structure is old, unsuitable, or when you want to maximise the buildable area on your plot.

How long does a landed rebuild take?

From design and authority submissions through demolition, structure and finishing, a full landed reconstruction typically takes about 18 to 24 months, depending on the size and complexity of the home and the approval timelines.

How much does it cost to rebuild a landed house?

Construction costs for a new erection typically start from around S$300 per square foot and rise with design complexity and finishes. Because every plot and brief differs, we provide a detailed, itemised quotation rather than a single headline figure.

Start your journey

Ready to build your dream home?

Tell us about your plot and your vision. We'll walk you through the process, the timeline and a clear, itemised cost — with no hidden surprises.