- Home
- A&A Works
Additions &alterations.
Extend, reconfigure and modernise your existing landed home without a full rebuild. As a BCA Class 1 builder, we handle the design, approvals and construction of your A&A works in-house.
What counts as A&A works?
Addition & Alteration (A&A) works modify or extend an existing landed home while keeping its structure — generally without exceeding 50% of the gross floor area or the load-bearing structure. It's the right route when your home is fundamentally sound but no longer fits how your family lives.
Typical A&A works include rear or side extensions, attic and loft additions, adding a home lift, internal reconfiguration, a new facade, and mechanical & electrical upgrades. Because A&A is regulated construction activity, it requires the relevant URA and BCA submissions — usually endorsed by a professional engineer — all of which we coordinate for you.
How an A&A project runs
Site assessment
We review your existing home and what you want to achieve, and advise what's possible within A&A rules before committing.
Design & submissions
We design the additions and alterations and coordinate the URA and BCA submissions with the professional engineer.
Construction
Structural, masonry, M&E and finishing works carried out largely in-house, minimising disruption and handoffs.
Handover
Final inspections, rectification and handover — tracked throughout in your private client portal.
Addition & Alteration vs. reconstruction
Need a full rebuild instead? See reconstruction & new erection. Want one team for the whole project? Explore design & build.
A&A works
- Keeps the existing structure — you work within it
- Generally within 50% of GFA and load-bearing structure
- Lower cost and shorter timeline (often ~6–12 months)
- Ideal for extending or modernising a sound home
Reconstruction / rebuild
- Demolish and build a fundamentally new home
- Best when the structure is old or you want maximum GFA
- Larger investment, longer programme
- Full design freedom from the ground up
Your questions, answered.
What are A&A works for a landed house?
A&A works modify or extend an existing landed home while keeping its structure — generally without exceeding 50% of the gross floor area or the load-bearing structure. Typical works include rear or side extensions, attic and loft additions, a home lift, internal reconfiguration, facade upgrades and M&E improvements.
Do A&A works need BCA and URA approval?
Yes. A&A works to a landed home are regulated construction activity and require the relevant URA and BCA submissions, typically endorsed by a professional engineer. We coordinate these approvals as part of the project.
Is A&A cheaper than rebuilding?
Generally yes. Because A&A retains the existing structure, it usually costs less and takes less time than a full reconstruction. The right choice depends on the condition of your home and how much you want to change.
Ready to build your dream home?
Tell us about your plot and your vision. We'll walk you through the process, the timeline and a clear, itemised cost — with no hidden surprises.