1. Home
  2. Pricing
Pricing philosophy

Honest pricing,no surprises.

Transparency is the foundation of trust. Here’s how we approach pricing — and why it matters.

Why no price list

Every landed home is unique.

The soil beneath your property, the orientation of your plot, the number of storeys you need, the materials you prefer — all of these significantly affect cost. A fixed price list would be either misleadingly low or unnecessarily high.

Instead, we provide detailed, customised quotations that reflect the true scope of your project — every item individually priced, every material specified, every cost accounted for.

We’ve heard too many stories of homeowners who chose the lowest quote, only to face a mountain of “variation orders” and “additional works” that doubled their budget. That’s not how we operate.

Indicative landed rebuild rates for 2026

Plan with real numbers.

Rates are per square foot of built-up area and include professional fees. Your final quotation depends on the agreed design, specifications and site conditions.

Standard build
S$300–400 /sqft

Clean, functional design with quality materials — for practical homeowners who value good construction without excess.

  • Standard fixtures & fittings
  • Basic landscaping
  • Standard M&E provisions
  • Tiled flooring throughout
Premium build
S$400–500 /sqft

Enhanced finishes, better material grades and more design flexibility. The sweet spot for most homeowners.

  • Upgraded fixtures & fittings
  • Designed landscaping
  • Enhanced M&E
  • Mix of premium flooring materials
Luxury build
S$500–650+ /sqft

Premium materials and bespoke detailing, with an installed home lift and neutral wiring. A swimming pool can be included where agreed in your quotation. Hitomo does not provide smart-home services.

  • Premium imported materials
  • Installed home lift
  • Neutral wiring provisions
  • Swimming pool where included in the agreed quotation

All amounts are in Singapore dollars. Professional fees are included in the indicative base rates. Land cost, GST, piling and basement works are excluded. Authority charges are paid by the client directly at actual cost. Optional features and specification upgrades must be confirmed in the written quotation. Luxury costs may exceed S$650 per built-up sq ft.

Our quotation is our promise

What you get in writing.

Line-by-line breakdown

Every item individually priced — no lump sums, no vague categories.

Material specifications

We specify the brand, model and grade of every material.

Payment tied to milestones

You pay as work is completed, not upfront.

Variation orders in writing

Any change is documented, agreed and signed before work proceeds.

No hidden fees

We don’t leave items out to make the price look lower.

Open-book approach

Ask us about any line item — we’ll walk you through the cost structure.

Cost variables to watch

Raised upfront — not after signing.

Soil conditions

Poor soil may need deeper piling or soil treatment.

Authority requirements

Additional URA, BCA or SCDF requirements can add cost.

Design changes mid-build

Changes after construction begins are costly.

Specification upgrades

Choosing higher-end finishes after signing is a common way budgets shift. We document each upgrade with a clear cost before committing.

Pricing FAQ

Straight answers.

How much does it cost to rebuild a landed home in Singapore?

For planning, our 2026 indicative rates are S$300–400 per built-up sq ft for Standard, S$400–500 for Premium and S$500–650+ for Luxury. These rates include professional fees. They exclude land cost, GST, piling and basement works. Authority charges are paid by the client directly at actual cost. The written quotation sets out your project’s scope, specifications and exclusions.

What's included in your quotation?

Our written quotation sets out the construction work, professional fees, specifications and exclusions for your project. Professional fees are included in the indicative psf rates. GST, piling and basement works are excluded from those base rates. Authority charges are paid by you directly at actual cost. We confirm any optional features and additional works in the project-specific quotation.

Do you charge for the initial consultation?

No. The initial consultation and site visit are complimentary.

How do you handle cost overruns?

Our detailed quotation process minimises the risk. If unforeseen circumstances arise, we provide a written variation order with clear pricing, and only proceed with your written approval.

Can I compare your quotation with other builders?

Absolutely — and we encourage it. Our detailed quotation makes comparison easy because every item is individually priced.

Start your journey

Get a detailed, no-obligation quotation.

Share your project details and we’ll prepare a comprehensive quotation — every cost itemised, every material specified.